Is there construction on m59 in Michigan?

Is there construction on m59 in Michigan?

The project will be constructed in two phases: Phase I, Romeo Plank Road to east of Elizabeth Road, March-November, 2021. Phase II, East of Elizabeth Road to I-94, March-November, 2022.

Is Schoenherr open going south?

Schoenherr Road has reopened to through traffic in both directions. The contractor is Pro-Line Asphalt. Please contact Macomb County 586-463-8671 with any questions regarding the project.

When was m59 built?

1920Michigan 59 / Constructed

What are they doing on Mound Road in Sterling Heights?

Innovate Mound, a partnership between MCDR and the cities of Warren and Sterling Heights, is an initiative to rebuild one of the most important corridors in southeast Michigan and the U.S. The Mound Road project will include new pavement, drainage, curbs and driveways, traffic signal optimization, roadway widening.

Who is Schoenherr named after?

German farming
Schoenherr Road is a divided highway between Metro Parkway to north of Hall Road. Schoenherr was named after a German farming family who owned a large amount of farmland which was bought up for the road’s construction. The last pieces of this land were purchased to build Sterling Heights High School.

How many miles is m59?

60.51 miMichigan 59 / Length

What exit is M 59 in Michigan?

All Businesses at Exit 67 (M-59 – Howell, Pontiac) along US 23 in Michigan | iExit Interstate Exit Guide.

Where is MDOT rebuilding the M-59?

MDOT is rebuilding 4.5 miles of M-59 in Clinton, Macomb, Harrison, and Chesterfield Townships in 2 phases over two years from Romeo Plank to I-94. Westbound and eastbound traffic will be impacted. Read on… Coming soon! Pitchford Park will be located on the westside of Romeo Plank ¼ north off 22 Mile Road.

Will M-59 in Macomb County be rebuilt or widen?

M-59 in Macomb County, also known as Hall Road, is maintained by MDOT. MDOT is set to rebuild 4.5 miles of M-59 in the townships in two phases over two years, from Romeo Plank Road to Interstate 94. The reconstruction project is set to begin this year at an estimated cost of $63 million. It does not call for widening of Hall Road.

How much work is being done on the M-59 bridge?

The Michigan Department of Transportation is investing $3.1 million for bridge work on eastbound M-59 between Utica Road and Van Dyke Avenue and northbound and southbound M-53 over 27 Mile Road, along with concrete patching work on southbound M-53 from 34 Mile Road to 27 Mile Road.

How much will it cost to rebuild M-59?

MDOT is set to rebuild 4.5 miles of M-59 in the townships in two phases over two years, from Romeo Plank Road to Interstate 94. The reconstruction project is set to begin this year at an estimated cost of $63 million. It does not call for widening of Hall Road.